Wedding preparation

The upper and lower shells are almost ready to marry. We are making the final adjustments:

 

This slideshow requires JavaScript.

It’s a long time since both molds were together. The next couple of weeks we’ll install some more ribs …

We also tested if the aft spar bridge fits well:

 

This bridge is only a piece for testing and fitting. The test piece for the main brige is beeing build by Siggi as of right now. The final bridges will be built by Eichelsdörfer GmbH using Siggi’s jigs. The material will be 1.7734.5 steel (better than SAE 4130).